[1]
Черненко, П., Мартинюк, О. and Мірошник, В. 2016. MODELING AND SHORT-TERM FORECASTING OF TECHNOLOGY COMPONENT OF ELECTRICAL LOAD OF THE REGIONAL ELECTRIC POWER SYSTEM. Tekhnichna Elektrodynamika. 4 (Jun. 2016), 068. DOI:https://doi.org/10.15407/techned2016.04.068.