Abstract
At the conditions of market relationships and economic and financial independence of power companies, these are guided by the principle of achieving maximum efficiency in their actions. In the article is considered the problem formulation of HPP cascade operational mode determination, ensuring maximum profit from the sales of the generated electric power at the day-ahead market. Dynamic volumes of reservoirs are taken into account using the lag time between the waves of HPP water flow. The problem solution using the method of statistical modelling is approbated on the example of hypothetical cascade of three HPP. The results of the modelling of cascade operating regime are illustrated graphically. References 5, figures 2, table 1.
References
Gornstein V.M. Optimal Operation Hydro Power Plants in Power Systems. – Moskva: Gosenergoizdat, 1959. − 248 p. (Rus)
Reznikovskii A.S., Rubinstein M.I. Modes Control of Hydroelectric Power Plants Reservoirs.– Мoskva: Energiia,1974.–176 p. (Rus)
Tsvetkov E.V., Alyabysheva T.M., Parfenov L.G. Optimal Regimes of Hydropower Plants in Power Systems. – Мoskva: Energoatomizdat, 1984. – 304 p. (Rus)
Radu Popa, Florica Popa, Bogdan Popa, Manuela Nicolescu. Optimal Operation of Cascade Hydropower Plants // U.P.B. Sci.Bull. Series D. − 2010. − Vol. 72. − Iss. 1. − Pp. 93−100.
Mahnitko A., Gerhards J., Linkevics O., Varfolomejeva R., Umbrasko I. Small Hydropower in Latvia and Intellectualization of its Operating Systems // Latvian Journal of Physics and Technical Sciences. − 2013. − Vol. 50 (6). − Pp. 3–15.
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Copyright (c) 2022 Array