Abstract
Features of planning work at power stations of United Power Systems of Ukraine (Obyednani Enerhetychni systemy Ukrainy) with STG and ASTG mutual usage were analyzed. Algorithms of boiler-turbine-generators constituents’ choice planning in the process of exploitation were developed. These algorithms take into account the operation modes based on particular power station reacth’e power and the difference between active power losses at STG and ASTG. References 3.
References
Venikov V.A., Zhuravlev V.G., Filippova T.A. Power stations and power systems modes optimization. - Moskva: Energoizdat, 1981. - 464 p. (Rus)
Oleksyn V.P., Myniaylo A.S., Matviichuk A.N. Parallelly operating synchronous and asynchronous turbo generators modes control // Elektricheskie stantsii. - 1989. - № 3. - C. 24-28. (Rus)
Chevychelov V.A. Asynchronous turbo generators usage efficiency // Elektricheskie stantsii. - 1986. - № 10. -C. 46-51. (Rus)
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Copyright (c) 2023 Array