STG AND ASTG MUTUAL WORK AT POWER STATIONS OF UNITED POWER SYSTEMS OF UKRAINE
ARTICLE_20_PDF (Українська)

Keywords

asynchronous turbo generator
boiler-turbine-generators constituents
operational planning асинхронізованнй турбогенератор
склад енергоблоків
планування режимів

How to Cite

[1]
Сегеда , М., Олексин, В. and Олексин , А. 2012. STG AND ASTG MUTUAL WORK AT POWER STATIONS OF UNITED POWER SYSTEMS OF UKRAINE . Tekhnichna Elektrodynamika. 3 (Apr. 2012), 045.

Abstract

Features of planning work at power stations of United Power Systems of Ukraine (Obyednani Enerhetychni systemy Ukrainy) with STG and ASTG mutual usage were analyzed. Algorithms of boiler-turbine-generators constituents’ choice planning in the process of exploitation were developed. These algorithms take into account the operation modes based on particular power station reacth’e power and the difference between active power losses at STG and ASTG. References 3.

ARTICLE_20_PDF (Українська)

References

Venikov V.A., Zhuravlev V.G., Filippova T.A. Power stations and power systems modes optimization. - Moskva: Energoizdat, 1981. - 464 p. (Rus)

Oleksyn V.P., Myniaylo A.S., Matviichuk A.N. Parallelly operating synchronous and asynchronous turbo generators modes control // Elektricheskie stantsii. - 1989. - № 3. - C. 24-28. (Rus)

Chevychelov V.A. Asynchronous turbo generators usage efficiency // Elektricheskie stantsii. - 1986. - № 10. -C. 46-51. (Rus)

Creative Commons License

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.

Copyright (c) 2023 Array

Abstract views: 20 | PDF Downloads: 10

Downloads

Download data is not yet available.