Abstract
The paper analyses the transient currents during the energisation of a 750 kV overhead transmission line (OTL). The safety of OTL state after symmetrical and asymmetrical closing of the circuit breakers and technical feasibility of SF6 circuit breakers opening with time delay after their closing is substantiated. The necessity of transient processes simulation for analysing the characteristics of periodic and direct components of currents is shown. A method for determining of SF6 circuit breaker opening time delay for a set of states that may arise after the energisation of OTL is developed. References 13, tables 2, figures 5.
References
IEC 62271-100 High voltage switchgear and controlgear – Part 100: Alternating-current circuit-breakers. Edition 2.2, 2017-06 CSV(en-fr). 621 p.
Kuznetsov V.G., Tugai Y.I., Shpolianskyi O.G.Analysis of the preconditions of SF6 circuit breakers’ damage in 750 kV electric networks. Pratsi Instytutu elektrodynamiky NAN Ukrainy. 2017. No 47. Pp. 16–22. DOI: https://doi.org/10.15407/publishing2017.47.016 (Ukr)
Epifanov A.M., Pugachenko Z.E., Konovalov A.A. The emergence of an direct current component when disconnecting reacted power lines and methods of dealing with it. Report at the III Scientific and Practical Conference Control of the technical condition of equipment of electric power facilities. Moscow, 2016. URL: http://www.uraldiag.ru/UPLOAD/user/novosti/09122016/5-pugachenko-ze-vozniknovenie-aperiodicheskoi-sostavlyayushei-pri-otkl-reaktirovannyh-lep.pdf (Rus) (accessed 10.04.2021)
Naumkin I.E. Emergency failures of SF6 circuit breakers during commutation of compensated overhead lines 500-1150 kV. Electrichestvo. 2012. No 10. Pp. 22-32. (Rus)
Chernoskutov D., Popovtsev V., Sarapulov S. Analysis of SF6 Circuit Breakers Failures Related to Missing Current Zero. Part II. Proceedings of the 2020 Ural Smart Energy Conference (USEC), Ekaterinburg, Russia, 13-15 November 2020. Pp. 55-58. DOI: https://doi.org/10.1109/USEC50097.2020.9281229
Shpolianskyi O.G. Reduction of overvoltages and aperiodic currents during energising of 750 kV power lines using controlled switching devices. International Ukraine-Poland Seminar Power quality in distribution networks with distributed generation, Kyiv, Ukraine, July 4-5, 2019. Pp. 197-202. (Ukr)
High-voltage surge arresters. Product guide. Siemens AG, Erlangen, Germany. 2014. 112 p.
Shpolianskyi O. Adjustment of the MATLAB surge arrester model parameters. Tekhnichna Elektrodynamika. 2020. No 5. Pp. 49 – 53. DOI: https://doi.org/10.15407/techned2020.05.049
Instrument module of relay protection and automation, backup protection and automation of 330 kV overhead line with SAR (L020). Operation manual AAVG.421453.005 - 105.01E RE2. NPP HARTRON-INCOR, 2020. 230 p. URL: https://hartron-inkor.com/sites/default/files/pdf/105.01e_re2_l020_oapv_aaeon_mms_goose.pdf (Rus) (accessed 10.04.2021)
Belyakov N.N., Kadomskaya K.P., Levinstein M.L., Pyatkov A.V., Rashkes V.S., Hoetzian K.V., Khoroshev M.I. Processes for single-phase reclosing of high voltage lines. Moskva: Energoatomizdat. 1991. 256 p. (Rus)
Kuznetsov V.G., Tugai Y.I. Improving the reliability and efficiency of main electrical networks. Pratsi Instytutu elektrodynamiky NAN Ukrainy. 2009. No 23. Pp. 110–118. (Ukr)
Live Tank Circuit Breakers – Buyer’s Guide. ABB AB High Voltage Products, Ludvika, Sweden, Edition 6, 2014. 152 p.
High-Voltage Circuit Breakers. Siemens AG Energy Sector. Erlangen, Germany, 2012. 28 p.
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Copyright (c) 2021 Array